
Real-time job costing for construction.

Chat with an expert, tour the Speedchain platform

Keep the structure you already run
Flex rules are built around your existing cost codes, nothing gets reorganized.
The field sees a short list
Job, then the cost codes that belong to it. A few taps, same as the direct-sync experience.
Admins control what's valid
Your team decides which cost codes go with which jobs, and which fields each role sees.
Accounting keeps full depth
Column visibility is role-based. The field gets simplicity, accounting keeps everything.

FAQ
Questions we get
Will field teams code transactions right?
How does Speedchain know our cost codes?
Does this replace job costing in our ERP?
Do cost types come through?
How long before the data is clean?
What about the spend that isn't on a card?
We've always allocated some spend to overhead. Is that wrong?
Does Speedchain connect to our ERP?




