Year-End Close Checklist for Contractors (2026)
Year-End Close Checklist for Contractors (2026)

Key takeaways
Start preparing for year-end close in November. Waiting until December to track down missing costs and receipts can leave accounting scrambling during the holidays.
Make sure completed jobs are closed, open jobs have updated cost-to-complete estimates, and subcontractor work is accounted for even if invoices haven't arrived.
The One Big Beautiful Bill Act, signed into law in July 2025, introduced several tax changes that contractors need to account for when closing their 2026 books. These include a higher 1099 reporting threshold, restored 100% bonus depreciation for qualifying equipment, and changes to how certain construction contracts are taxed.
Closing the books at year-end is more complicated for contractors than simply reconciling bank accounts and reviewing expenses.
Accounting needs to know which jobs are finished, what it will cost to complete the ones still underway, and whether all materials, labor, equipment, and subcontractor costs have been recorded.
There may also be outstanding change orders, retainage, and work that hasn’t been billed yet.
The problem is that some of that information is still sitting with PMs, subcontractors, and field crews. If accounting doesn’t get it until the last week of December, the close can drag well into January.
Starting in November gives contractors time to correct job costs, collect missing documentation, and resolve outstanding billing before year-end.
This checklist covers what to review each month, along with several 2026 tax changes worth discussing with your CPA.

Key takeaways
Start preparing for year-end close in November. Waiting until December to track down missing costs and receipts can leave accounting scrambling during the holidays.
Make sure completed jobs are closed, open jobs have updated cost-to-complete estimates, and subcontractor work is accounted for even if invoices haven't arrived.
The One Big Beautiful Bill Act, signed into law in July 2025, introduced several tax changes that contractors need to account for when closing their 2026 books. These include a higher 1099 reporting threshold, restored 100% bonus depreciation for qualifying equipment, and changes to how certain construction contracts are taxed.
Closing the books at year-end is more complicated for contractors than simply reconciling bank accounts and reviewing expenses.
Accounting needs to know which jobs are finished, what it will cost to complete the ones still underway, and whether all materials, labor, equipment, and subcontractor costs have been recorded.
There may also be outstanding change orders, retainage, and work that hasn’t been billed yet.
The problem is that some of that information is still sitting with PMs, subcontractors, and field crews. If accounting doesn’t get it until the last week of December, the close can drag well into January.
Starting in November gives contractors time to correct job costs, collect missing documentation, and resolve outstanding billing before year-end.
This checklist covers what to review each month, along with several 2026 tax changes worth discussing with your CPA.
What changed for contractors in 2026?
Several federal tax changes may affect how construction companies prepare their 2026 returns. Some affect reporting requirements, while others could influence equipment purchases and how contractors recognize income from long-term jobs.
The 1099 reporting threshold increased
For payments made in 2026, the federal reporting threshold for Forms 1099-NEC and 1099-MISC increased from $600 to $2,000. That means contractors generally won’t need to issue these forms when total reportable payments to a payee for the year are under $2,000, although requirements depend on the payment type and recipient. Some states have different reporting rules, so contractors should check their state requirements before preparing forms.
1099-NEC forms are due February 1, 2027
January 31 falls on a Sunday in 2027, moving the federal deadline for 2026 Forms 1099-NEC to Monday, February 1. Contractors should have subcontractor and vendor information ready before January so they’re not tracking down W-9s while trying to finish the close.
Qualifying equipment may be eligible for 100% bonus depreciation
The One Big Beautiful Bill Act restored 100% bonus depreciation for qualifying property acquired and placed in service after January 19, 2025. For 2026, the Section 179 deduction limit is $2,560,000, with the deduction beginning to phase out when qualifying property placed in service during the year exceeds $4,090,000.
For contractors planning to buy trucks, machinery, or other equipment, the purchase date and when the equipment is ready and available for use can affect the deduction. Talk with your CPA before making a large purchase solely for tax reasons. The best option depends on the equipment, your business, and your tax situation.
The small contractor gross receipts threshold increased
For tax years beginning in 2026, the average annual gross receipts threshold under Section 448(c) is $32 million. This matters because certain smaller contractors may qualify for an exception to the percentage-of-completion tax accounting method for eligible contracts expected to be completed within two years. Contractors near the threshold should review their gross receipts with their CPA, particularly if they operate multiple related businesses.
Residential construction contracts may qualify for different tax treatment
The 2026 changes also affect the percentage-of-completion rules for certain residential construction contracts. Under the One Big Beautiful Bill Act, residential construction contracts entered into on or after January 1, 2026 (for calendar-year taxpayers) may be exempt from the percentage-of-completion method regardless of the contractor’s gross receipts. Residential contractors should ask their CPA which contracts qualify and whether the change affects their tax accounting method.
What changed for contractors in 2026?
Several federal tax changes may affect how construction companies prepare their 2026 returns. Some affect reporting requirements, while others could influence equipment purchases and how contractors recognize income from long-term jobs.
The 1099 reporting threshold increased
For payments made in 2026, the federal reporting threshold for Forms 1099-NEC and 1099-MISC increased from $600 to $2,000. That means contractors generally won’t need to issue these forms when total reportable payments to a payee for the year are under $2,000, although requirements depend on the payment type and recipient. Some states have different reporting rules, so contractors should check their state requirements before preparing forms.
1099-NEC forms are due February 1, 2027
January 31 falls on a Sunday in 2027, moving the federal deadline for 2026 Forms 1099-NEC to Monday, February 1. Contractors should have subcontractor and vendor information ready before January so they’re not tracking down W-9s while trying to finish the close.
Qualifying equipment may be eligible for 100% bonus depreciation
The One Big Beautiful Bill Act restored 100% bonus depreciation for qualifying property acquired and placed in service after January 19, 2025. For 2026, the Section 179 deduction limit is $2,560,000, with the deduction beginning to phase out when qualifying property placed in service during the year exceeds $4,090,000.
For contractors planning to buy trucks, machinery, or other equipment, the purchase date and when the equipment is ready and available for use can affect the deduction. Talk with your CPA before making a large purchase solely for tax reasons. The best option depends on the equipment, your business, and your tax situation.
The small contractor gross receipts threshold increased
For tax years beginning in 2026, the average annual gross receipts threshold under Section 448(c) is $32 million. This matters because certain smaller contractors may qualify for an exception to the percentage-of-completion tax accounting method for eligible contracts expected to be completed within two years. Contractors near the threshold should review their gross receipts with their CPA, particularly if they operate multiple related businesses.
Residential construction contracts may qualify for different tax treatment
The 2026 changes also affect the percentage-of-completion rules for certain residential construction contracts. Under the One Big Beautiful Bill Act, residential construction contracts entered into on or after January 1, 2026 (for calendar-year taxpayers) may be exempt from the percentage-of-completion method regardless of the contractor’s gross receipts. Residential contractors should ask their CPA which contracts qualify and whether the change affects their tax accounting method.

Year-end close checklist for construction companies
The earlier contractors start preparing, the less accounting has to sort out in December. Here's what to tackle each month to make year-end close easier.
November: clean up job costs and outstanding purchases
November is a good time to find missing information while PMs, foremen, and vendors still have time to help.
Review open and completed jobs
Pull a list of every active job and confirm which ones are actually finished. Close completed jobs according to company procedures so unrelated charges don’t continue showing up on them.
Ask PMs to update their estimates of what it will cost to finish each open job. Accounting needs those numbers to prepare accurate year-end WIP reports.
Review jobs with unusually high miscellaneous, overhead, or uncoded charges. Those costs may belong to specific jobs or phases. (See [Construction Cost Coding Mistakes].)
Clean up company card purchases
Review purchases missing receipts, jobs, or cost codes. Follow up with employees and vendors before more time passes. (Link to [Lost Receipts for Business Expenses: What Contractors Can Do].)
Clear uncoded transactions and charges sitting in temporary accounts.
Review active cardholders. Cancel or restrict cards belonging to employees who have left the company or changed responsibilities.
Check subcontractor and vendor records
Collect missing W-9s from subcontractors and vendors who may require tax reporting.
Review subcontractor certificates of insurance and request updated copies where needed. Missing documentation can create problems during insurance audits.
Meet with your CPA
Discuss planned equipment purchases and potential depreciation deductions.
Review whether your company qualifies for the small contractor tax accounting exception.
If you perform residential construction, ask whether any new tax provisions affect your contracts.
December: make sure the costs belong in the right year
In December, contractors need to confirm that work performed and purchases made during the year are recorded in the correct period.
Reconcile cash and company cards
Reconcile bank and credit card accounts through November. (Link [Credit Card Reconciliation for Construction Companies].)
Set a deadline for employees to submit December receipts and job information.
Review how purchases made during the final days of December will be recorded, especially if company card billing cycles don’t match the calendar month.
Account for subcontractor work that hasn’t been billed
A subcontractor may finish work in December but not send the invoice until January. Depending on the company’s accounting method, you may still need to record that cost in December.
Ask PMs and superintendents to identify subcontractor work completed but not yet invoiced.
Review open purchase orders and subcontract commitments to confirm how much work remains.
Reconcile retainage owed to subcontractors and retainage customers still owe the company.
Review customer billing
Submit December pay applications by the required deadlines.
Review jobs where costs are ahead of billing and determine what can be billed before year-end.
Collect required lien waivers and other supporting documents for subcontractor payments.
Check materials and equipment
Identify materials stored on jobsites or in the yard that haven’t been installed. Depending on the contract and accounting method, those materials may need special treatment when calculating percentage complete.
Confirm when equipment purchased during the year was placed in service so depreciation can be calculated correctly.
Year-end week: review job costs and finalize WIP
By the final week of December, accounting should be reviewing the numbers rather than trying to find months of missing receipts.
Review final job costs
Run updated job cost reports and review major budget differences with PMs.
Make sure total job costs agree with the appropriate accounts in the general ledger.
Review jobs where projected profit has dropped since the original estimate. Determine whether the change reflects actual overruns, missing costs, or outdated estimates.
Finalize the WIP schedule
The work-in-progress (WIP) schedule shows how much revenue and profit the company expects to recognize on unfinished jobs.
To prepare it, accounting needs current job costs, contract values, approved changes, and estimates of the cost to complete the remaining work.
Update the WIP schedule using the latest cost-to-complete estimates.
Review overbillings and underbillings by job.
Record the appropriate year-end adjustments.
Have someone other than the person who prepared the schedule review it.
Banks and sureties often use WIP reports to evaluate a contractor’s financial position, so errors can affect more than the company’s internal reports. (Link [Construction Job Cost Report: What It Should Show].)
Close the accounting period
Once final entries and reviews are complete, close or lock the period in your accounting system according to company procedures. That helps prevent late transactions from changing prior-year balances without review.
January: finish reporting and prepare for the new year
In January, contractors complete year-end reporting and address any remaining accounting and payroll requirements.
Complete tax and payroll reporting
Prepare and file required Forms 1099-NEC for 2026 payments by February 1, 2027.
Check whether any additional federal or state 1099 reporting requirements apply.
Complete W-2s and required year-end payroll reporting by the applicable deadlines.
Prepare for insurance audits
Workers’ compensation and general liability audits may require payroll records, subcontractor payments, certificates of insurance, and employee or job classifications. Collecting that information ahead of time can reduce follow-up during the audit.
Get purchasing rules ready for the new year
Review company card limits and make sure active cardholders match your current employees.
Update your construction expense policy if purchasing responsibilities or approval requirements have changed. (Link [Construction Expense Policy Template].)
Set up new jobs and cost codes in your accounting system before employees begin charging purchases to them.
February and March: finish financial reporting
Some year-end work continues after the books are closed. Contractors may need CPA-prepared financial statements for their bank, surety, or bonding program. Requirements vary, but some sureties expect statements within approximately 90 days of year-end.
Ask your CPA and bonding agent about their deadlines early so there is enough time to complete any required review or audit. This is also a good time to compare estimated costs against what completed jobs actually cost. If labor, materials, or equipment consistently ran over budget, estimators need that information before pricing similar work in the new year.

Year-end close checklist for construction companies
The earlier contractors start preparing, the less accounting has to sort out in December. Here's what to tackle each month to make year-end close easier.
November: clean up job costs and outstanding purchases
November is a good time to find missing information while PMs, foremen, and vendors still have time to help.
Review open and completed jobs
Pull a list of every active job and confirm which ones are actually finished. Close completed jobs according to company procedures so unrelated charges don’t continue showing up on them.
Ask PMs to update their estimates of what it will cost to finish each open job. Accounting needs those numbers to prepare accurate year-end WIP reports.
Review jobs with unusually high miscellaneous, overhead, or uncoded charges. Those costs may belong to specific jobs or phases. (See [Construction Cost Coding Mistakes].)
Clean up company card purchases
Review purchases missing receipts, jobs, or cost codes. Follow up with employees and vendors before more time passes. (Link to [Lost Receipts for Business Expenses: What Contractors Can Do].)
Clear uncoded transactions and charges sitting in temporary accounts.
Review active cardholders. Cancel or restrict cards belonging to employees who have left the company or changed responsibilities.
Check subcontractor and vendor records
Collect missing W-9s from subcontractors and vendors who may require tax reporting.
Review subcontractor certificates of insurance and request updated copies where needed. Missing documentation can create problems during insurance audits.
Meet with your CPA
Discuss planned equipment purchases and potential depreciation deductions.
Review whether your company qualifies for the small contractor tax accounting exception.
If you perform residential construction, ask whether any new tax provisions affect your contracts.
December: make sure the costs belong in the right year
In December, contractors need to confirm that work performed and purchases made during the year are recorded in the correct period.
Reconcile cash and company cards
Reconcile bank and credit card accounts through November. (Link [Credit Card Reconciliation for Construction Companies].)
Set a deadline for employees to submit December receipts and job information.
Review how purchases made during the final days of December will be recorded, especially if company card billing cycles don’t match the calendar month.
Account for subcontractor work that hasn’t been billed
A subcontractor may finish work in December but not send the invoice until January. Depending on the company’s accounting method, you may still need to record that cost in December.
Ask PMs and superintendents to identify subcontractor work completed but not yet invoiced.
Review open purchase orders and subcontract commitments to confirm how much work remains.
Reconcile retainage owed to subcontractors and retainage customers still owe the company.
Review customer billing
Submit December pay applications by the required deadlines.
Review jobs where costs are ahead of billing and determine what can be billed before year-end.
Collect required lien waivers and other supporting documents for subcontractor payments.
Check materials and equipment
Identify materials stored on jobsites or in the yard that haven’t been installed. Depending on the contract and accounting method, those materials may need special treatment when calculating percentage complete.
Confirm when equipment purchased during the year was placed in service so depreciation can be calculated correctly.
Year-end week: review job costs and finalize WIP
By the final week of December, accounting should be reviewing the numbers rather than trying to find months of missing receipts.
Review final job costs
Run updated job cost reports and review major budget differences with PMs.
Make sure total job costs agree with the appropriate accounts in the general ledger.
Review jobs where projected profit has dropped since the original estimate. Determine whether the change reflects actual overruns, missing costs, or outdated estimates.
Finalize the WIP schedule
The work-in-progress (WIP) schedule shows how much revenue and profit the company expects to recognize on unfinished jobs.
To prepare it, accounting needs current job costs, contract values, approved changes, and estimates of the cost to complete the remaining work.
Update the WIP schedule using the latest cost-to-complete estimates.
Review overbillings and underbillings by job.
Record the appropriate year-end adjustments.
Have someone other than the person who prepared the schedule review it.
Banks and sureties often use WIP reports to evaluate a contractor’s financial position, so errors can affect more than the company’s internal reports. (Link [Construction Job Cost Report: What It Should Show].)
Close the accounting period
Once final entries and reviews are complete, close or lock the period in your accounting system according to company procedures. That helps prevent late transactions from changing prior-year balances without review.
January: finish reporting and prepare for the new year
In January, contractors complete year-end reporting and address any remaining accounting and payroll requirements.
Complete tax and payroll reporting
Prepare and file required Forms 1099-NEC for 2026 payments by February 1, 2027.
Check whether any additional federal or state 1099 reporting requirements apply.
Complete W-2s and required year-end payroll reporting by the applicable deadlines.
Prepare for insurance audits
Workers’ compensation and general liability audits may require payroll records, subcontractor payments, certificates of insurance, and employee or job classifications. Collecting that information ahead of time can reduce follow-up during the audit.
Get purchasing rules ready for the new year
Review company card limits and make sure active cardholders match your current employees.
Update your construction expense policy if purchasing responsibilities or approval requirements have changed. (Link [Construction Expense Policy Template].)
Set up new jobs and cost codes in your accounting system before employees begin charging purchases to them.
February and March: finish financial reporting
Some year-end work continues after the books are closed. Contractors may need CPA-prepared financial statements for their bank, surety, or bonding program. Requirements vary, but some sureties expect statements within approximately 90 days of year-end.
Ask your CPA and bonding agent about their deadlines early so there is enough time to complete any required review or audit. This is also a good time to compare estimated costs against what completed jobs actually cost. If labor, materials, or equipment consistently ran over budget, estimators need that information before pricing similar work in the new year.
Why construction year-end close gets delayed
Much year-end cleanup comes from purchases and job information that weren’t recorded correctly during the year.
Missing receipts. Employees may have made purchases months earlier without submitting receipts. Accounting now has to contact the employee or vendor to document the expense.
Purchases assigned to the wrong job. If accounting guessed at cost codes or used temporary categories, those charges may need review and correction before the final job cost reports are accurate.
Jobs that were never closed. A completed job may still be receiving charges that belong to another project. That can affect the final cost history and job profitability.
Company cards shared between employees. When several people use the same card, accounting may struggle to determine who made a purchase or which job it was for.
Subcontractor costs that haven’t been recorded. Work may be complete even though the invoice hasn’t arrived. If those costs are missing, the job can appear more profitable than it really is.
Contractors can reduce much of this cleanup by reviewing job costs and field purchases throughout the year. Waiting until December means accounting may be correcting transactions from months earlier while also preparing WIP, payroll reports, and year-end financial statements.
How Speedchain helps contractors prepare for year-end close
Year-end close gets harder when accounting has to spend November and December tracking down earlier purchases.
Speedchain helps contractors keep field purchases organized as they happen. Employees use their individual commercial Mastercard cards, select the job and cost code, and capture the receipt with their phones. AI-powered receipt capture reduces the information crews have to enter by hand.
Speedchain integrates with construction accounting systems including Sage 300 CRE, Sage Intacct, QuickBooks Desktop, Spectrum, Vista, and Acumatica. These integrations help get purchases into accounting with the job and cost code already attached, reducing the manual work of entering and correcting transactions.
When purchases are documented and coded throughout the year, accounting has fewer missing receipts and unexplained charges to resolve during the close. PMs can see what their crews spent without waiting for month-end.
Frequently asked questions
What should a contractor’s year-end close checklist include?
A contractor’s year-end checklist should cover completed and open jobs, updated cost-to-complete estimates, missing receipts, credit card reconciliation, subcontractor accruals, retainage, customer billing, and WIP reporting. It should also include tax and payroll reporting, insurance audit preparation, and financial statements required by the company’s bank or surety.
What is the 1099 threshold for 2026?
For payments made in 2026, the federal reporting threshold for Forms 1099-NEC and 1099-MISC is $2,000, up from $600. Contractors should confirm which payments and recipients are subject to reporting and check state requirements before filing.
When are 1099s due for 2026 payments?
For 2026 payments, the federal deadline to file and furnish Forms 1099-NEC is February 1, 2027, because January 31 falls on a Sunday.
Can contractors use 100% bonus depreciation in 2026?
Qualifying equipment may be eligible for 100% bonus depreciation under the One Big Beautiful Bill Act, which restored it for property acquired and placed in service after January 19, 2025. Contractors should review acquisition and placed-in-service dates, equipment eligibility, and Section 179 alternatives with their CPA before claiming a deduction.
What is the small contractor exception to percentage-of-completion?
Certain smaller contractors may qualify for an exception to the percentage-of-completion tax accounting method for eligible contracts expected to be completed within two years. For tax years beginning in 2026, the average annual gross receipts threshold is $32 million. Other eligibility requirements may apply.
When do sureties need year-end financial statements?
Deadlines depend on the surety and bonding program. Some require CPA-prepared financial statements within approximately 90 days after year-end. Contractors should confirm reporting requirements with their bonding agent and CPA before the close.
Why construction year-end close gets delayed
Much year-end cleanup comes from purchases and job information that weren’t recorded correctly during the year.
Missing receipts. Employees may have made purchases months earlier without submitting receipts. Accounting now has to contact the employee or vendor to document the expense.
Purchases assigned to the wrong job. If accounting guessed at cost codes or used temporary categories, those charges may need review and correction before the final job cost reports are accurate.
Jobs that were never closed. A completed job may still be receiving charges that belong to another project. That can affect the final cost history and job profitability.
Company cards shared between employees. When several people use the same card, accounting may struggle to determine who made a purchase or which job it was for.
Subcontractor costs that haven’t been recorded. Work may be complete even though the invoice hasn’t arrived. If those costs are missing, the job can appear more profitable than it really is.
Contractors can reduce much of this cleanup by reviewing job costs and field purchases throughout the year. Waiting until December means accounting may be correcting transactions from months earlier while also preparing WIP, payroll reports, and year-end financial statements.
How Speedchain helps contractors prepare for year-end close
Year-end close gets harder when accounting has to spend November and December tracking down earlier purchases.
Speedchain helps contractors keep field purchases organized as they happen. Employees use their individual commercial Mastercard cards, select the job and cost code, and capture the receipt with their phones. AI-powered receipt capture reduces the information crews have to enter by hand.
Speedchain integrates with construction accounting systems including Sage 300 CRE, Sage Intacct, QuickBooks Desktop, Spectrum, Vista, and Acumatica. These integrations help get purchases into accounting with the job and cost code already attached, reducing the manual work of entering and correcting transactions.
When purchases are documented and coded throughout the year, accounting has fewer missing receipts and unexplained charges to resolve during the close. PMs can see what their crews spent without waiting for month-end.